Contact Info

  • shuanghao@cap199.com
  • 0086-15168691564
  • 0086-576-89166850
  • No. 12, Yonggu Road, Jiangkou Street, Huangyan,Taizhou,Zhejiang,China
Flip top cap mould We support customer R&D. Make the files or improve the design if you needed.

Flip top cap mould We support customer R&D. Make the files or improve the design if you needed.


Automatic flip top cap mould structure is more difficult than normal caps, the mold ejection system is special and have double steps. the cap closing success rate is very important to the Mould.

https://www.cap-molds.com/product/Flip-top-caps-mould.html

Cap Mold Feature
1. Adopt imported steel P20, Germany 2316, S136 etc.
2. Each cavity and core have independent cooling system, BeCu add in the core of mold, shortening production cycle time.
3. Rational mold design to extend mold life and get high production efficiency.
4. Mirror hand polishing and mold plates chroming to create added-value.
5. Precision Machining to ensure high production efficiency & fine parting line effect.
6. Skilled Language in communication and experienced in international standard.
7. Hot runner system: China advanced brand or imported hot runner system brand.
Each cavity has independent temperature control and heater system.
8. Anti-theft cap mold or based on customer's design.

 DSC_0738.jpg

Flip top cap mold
1.R&DWe support customer R&D. Make the files or improve the design if you needed.
2.Quotation MakingMould Quotation will be finished in 1 day according to information we get.
3.NegotiationThe quality, price, material, delivery time, payment item, etc.
4.Mould Design1-2days for product 3D/2D drawing design as per customer's design or our company's design. Then in further make the mould 2D/3D design.
5.Mould1. confirm the proucts and the mold design
2. Mould material prepare
3. Rough machining(heat treatment on mold base and pre-harden on mold)
4. CNC/ Vacuum Hardening on mold main spare parts
5. finishing machining( JDPAINT, DEM.etc)
6. Dimension inspection
7. Ejector& runner& cooling & other device process
8. Assemble mold
6.Mould TestingWhen moulds are finished, we will test the mould and we will send samples for consumer reference.
7. Sample confirmationIf the first sample is not satisfied by customer when it is come out. We modify the mould and until meet customer’s satisfaction.
8.DeliveryDelivery goods by sea or by air, according to customer’s requirement.