Contact Info

  • shuanghao@cap199.com
  • 0086-15168691564
  • 0086-576-89166850
  • No. 12, Yonggu Road, Jiangkou Street, Huangyan,Taizhou,Zhejiang,China
Bottle Cap folding machine

Bottle Cap folding machine


38mm plastic bottle cap folding machine / cap slitting machine products

AUTO CAP SLITTING MACHINE IS DEVELOPED TO SLIT/CUT THE CAP TO FORM THE TAMPER BAND IN LINE.

IMG_38822.jpg

Factory price high speed plastic cap slitting machine cap folding slitting machine for cap cutting treatment:

Plastic cap slitting machine  have high reputation in competitive price and high quality.

Plastic cap slitting machine which is used in cutting caps to form the tamper evident band. This machine is the auxiliary machine of treatment of plastic caps. We can produce any kinds of plastic cap slitting machine in accord with customer requirement.

PROCEDURE OF OPERATE:

1), PUT OR LOAD THE CAPS INTO THE STORAGE BIN.

2), CAPS WILL BE LOADED TO THE SORTTING BIN AUTOMATICALLY.

3), WITH THE HELP OF ROTATION,CAPS WILL BE CUTTED.

4), FINAL CAPS ARE OUTPUTTED.

切口机 (2).jpg

TERMS
PRICE TERMS

EXW price

PAYMENT TERMS

T/T 30% for deposit,70%balance after BUYER approve all the machine and before shipment

DELIVERYUpon receipt of deposit, all machines need 50-55        working days to be completed.
PACKING

Standard Sea Shipping Packing

GUARANTEE

During normal operation, 18 months guarantee period is valid for all machines.

AFTER-SALESSERVICE 

• When the above listed machines are completed, the Buyer shall dispatch their qualified engineers to inspect their machines in manufacturer’s factory. The produced plastic caps from these machines should be checked against with the samples which given

by the Buyer before, and inspect approval by buyer.

• When the inspection, testing is done, the Seller will ship machines ASAP.

• Upon arrival of the machines at the Buyer’s factory, the Seller shall dispatch an engineer to the Buyer’s factory to install, debug the machines until all machines can produce qualified plastic caps. And the engineer also should train their technician to operate machine.

• Engineer’s tour including round-trip air tickets, lodging, boarding and transportation will be borne by the Buyer.

• Time for installation and debugging in Buyer’s factory: 5-7DAYS